Continuous Waste Rubber Recycling Machine
1. THE END PRODUCT AND OUTPUT FIELD FROM the Continuous Waste Rubber Recycling Machine:
End product |
Percentage |
Usage |
Fuel oil |
40%-50% |
1. Used as fuel in Industrial such as steel&iron factories, chemical industrial or hotels and restaurants. 2. For heavy oil generators to get electricity. 3. For distillation to non-standard diesel oil |
Crude carbon black |
35% |
1. Used for construction bricks; 2. Deep-processed to N330, N660, N774 or color carbon black. |
Steel wire |
10%-15% |
Sold or reprocessing
|
Sync gas |
10% |
Used for heating the reactor |
end product fuel oil parameter:
Item |
Density |
Solidifying Point |
Flash Point |
Viscosity |
Heating Value |
Cetane Number |
Unit |
g/cm3 |
ºC |
ºC |
mm2/s |
Kcal/kg |
* |
Result |
0.88~0.90 |
-10 |
40 |
2.5 |
10500 |
30 |
From: Chongqing, China |
Inspection Date8th Dec., 2015 |
|
2. Main Parts and function of Used the Continuous Waste Rubber Recycling Machine
3. PARAMETERS BRIEF INTRODUCTION of the Continuous Waste Rubber Recycling Machine
NO. |
ITEM |
Technical Parameter |
1 |
Suitable Raw Materials |
≤5cm Small pieces of Waste tyre, rubber, waste plastic |
2 |
Operating Mode |
Fully Continuous Operation |
3 |
Structure |
Horizontal rotation Type |
4 |
Loading and discharging |
Fully automatic feeding and discharging under high temperature at same time |
5 |
Capacity(24h) |
24~40Mt |
6 |
Work Pressure |
Slightly Negative Pressure |
7 |
Oil Yield of tyres |
38%-45% |
8 |
Power |
60kwh~80kwh |
9 |
Cooling Method |
Cycle water |
10 |
Type of Drive |
Outer gear |
11 |
Noise dB(A) |
≤85 |
12 |
Main Reactor Weight (MT) |
About 27Mt |
13 |
Total Weight(MT) |
About 70Mt |
14 |
Installation Space Required |
20m*30m |
15 |
Manpower |
2~3/shift |
16 |
Shipment |
2*40FR+4*40'HC |
17 |
Delivery time |
≤80Days |
4. Feasibility Analysis for your reference of the Continuous Waste Rubber Recycling Machine:
NO |
Item |
Details |
1 |
Daily Capacity |
24T |
2 |
Raw Materials |
All rubber and plastic products |
3 |
Material cost |
24T*300¥/MT=7200RMB |
4 |
Catalyst cost |
24T*0.3%*5000¥/MT=360RMB¥ |
5 |
Labor |
6P*150¥/D/P=900RMB |
6 |
Electricity (pyrolysis + shredding) |
80KWH*24h=1920RMB |
300kwh*10h=3000RMB |
7 |
Fuel cost |
0 |
8 |
Others |
300RMB(as emergency) |
9 |
Cost Amount |
13,680.00¥ |
10 |
Oil income |
24MT*40%*3500¥/MT=33,600.00RMB |
11 |
Carbon black income |
24MT*35%*100¥/MT=840.00RMB |
12 |
Steel wires income |
24MT*13%*300¥/MT=936.00RMB |
13 |
Income amount |
RMB35,376.00¥ |
14 |
Daily net profit |
35,376.00¥−13,680.00¥=21,696.00RMB |
15 |
Monthly net profit |
21696.00¥/D*25D=542,400.00RMB |
16 |
Annual net profit |
542,400.00¥/M*11M=5,966,400.00,00RMB |
This data is according to Huaian City market price dated on 28th Nov., 2018. |
Please do some analysis according to your market price. This data is only for reference. |
5: Unique Features & Advantages of the Continuous Waste Rubber Recycling Machine:
(1): Better security. The biggest safety hazard of the pyrolysis plant lies in the possibility of explosion and fire. And the two security risks are all caused by excessive pressure, so how to deal with it?
Our company adopts the prevention method, that is, we won't allow the pressure to be too high; the other companies adopts the treatment method after the pressure is higher, that is, when the pressure has been too high, the safety valve installed at the rector door would be driven to be exploded due to high pressure to carry out the pressure for emergency relief. The disadvantage of this method is that even if the pressure leaks out of the reactor, the possibility of fire occurs at the same time with the occurrence probability as high as 90% or more. And the fire will in turn affect the main reactor.
The preventive measures adopted by our company are: to ensure the smoothness of the pyrolysis operation and the pipelines at all times, and to prevent plugging and leaking; if there is no blockage, the pressure will not suddenly rise, and there will be no reactor explosion or fire without pressure!
As well as the emergency relief valves equipped in other locations, the water seal anti-tempering safety device, etc. are conventional configurations and will not be described here.
(2): High oil yield and good oil quality: Other companies often have residual oil tanks or heavy oil tanks, and each batch production will produce 100kg~400KG residual oil or heavy oil. This kind of residue oil is very viscous and very dark in color, cannot be sold directly or sold at very low prices. If you mix this residue oil with good quality fuel oil, it will lower the quality of the oil and lower the price. If you throw away it is kind of waste and will pollute the environment. If it is extracted and put into the pyrolysis reactor again for cracking, it will waste labor and the process is dirty.
The anti-blocking device used by our company rotates counterclockwise during production, and the residual oil and other impurities separated from the gas separation package can be pushed back into the reactor for secondary cracking until all high quality oil extracted. The impurities are partially dried to powdery carbon black. Therefore, in one batch, the oil production rate from our machines is 2% to 5% higher than that from other companies; at the same time, it removes the secondary treatment of residual oil and possible pollution problems.
At the same time, the technology of this invention patent reduces the rate of the phenomenon of carbon black rising due to the rotation of the reactor in the production processby more than 90%, which makes the carbon black content in the oilgreatly reduced, improves the quality of the oil.
(3): The equipment pipeline cleaning period is greatly extended: the anti-blocking system adopted by our company ensures the cleanliness of the pipeline while restraining the carbon black from entering the pipeline, which makes the cleaning cycle of our equipment doubled compared with other equipment, which saves Human resources, in turn, enable the equipment to continue to operate.
(4): Our equipment has better sealing performance: the sealing performance lies in two aspects, one is the sealing at the reactor door and the other is the sealing at the air outlet location. In terms of reactor door, our design is more reasonable and elliptical, and the door is reinforced several times. No matter which kind of raw material is fed, this design can balance the convenience of full door opening and reduce the possibility of door deformation. The elliptical design allows the high-quality packing to slowly change direction when the corner seal is made, the packing structure does not change, and the small square or round door is not convenient to feed the materials, and second the packing is suddenly changed, which makes the structure become slack and is prone to air leakage.
Our reactor door is made of anti-deformation material and design, it will not be deformed, drooping or tightly sealed for a long time.
Sealing at the air outlet location, our company adopts an integrated design, that is, the air outlet is welded directly to the reactor body to increase the sealing performance, and the two-way sealing design makes the possibility of air leakage lower. The outlet designed by other companies are mostly a simple straight package, and there is no design for two-way sealing.
(5): Anti-stick and automatic clearing device: Our equipment adopts heat treatment and filming process on the inner wall of the reactor before the first usage, so that the coating agent can penetrate into the steel of the furnace wall to form a plated film, which can prevent the reactor wall from sticking together, avoid flash explosions. The automatic clearing machine adopts the chain scraper structure, and the clearing is more thorough.
(6): Equipment quality: first, the materials used is really national standard furnace steel, no non-standard materials.
The second is the welding process: our company adopts automatic welding process, no trachoma, and the welding surface is neat and beautiful.
Third, Built-up in the first class workmanship and superior parts. Every single plant has passed the severe inspection procedures to ensure the best quality to be delivered to each of our customer.
(7): After-sales service: The equipment is maintained for life. If there is any problem, the confirmation reply will be given within 24 hours after the sale, and the 48-hour personnel will start the on-site service in China or begin the preparation to apply for visa.
(8): Highly automatic control system, Digital Monitoring and PLC System optional.
6: Technology and Operation of the Continuous Waste Rubber Recycling Machine flowchart:
- General introduction: The tire pieces (suggest not more than 5cm*5cm, better without steel inside or waste plastic transported to the auto feeder and loaded into the pyrolysis reactor, then the oil part turn into gas condition and flow through the gas separator into 3 sets of condensers one by one, stored in the tank finally. The sync gas purified and collected then back to furnace and burned as fuel to save energy. The char discharged out of the reactor and collected by the collecting system, then stored in the hopper ready for deep process.
All process is fully sealed, fully continuous from loading, discharging, oil condensing, also no pollution emission at all.
- Sync Gas:The sync gas generated about 3~10% totally according to the oil water content, it is pollution gas, but with huge heating value, cannot be emitted directly. We adopt gas purification and recycling technology, all such gas will be purified first to remove the Sulphur and Chlorine content, then recycled to the burning room burned as fuel to save operation cost as well as prevent gas pollution. If buyer need, also can collected and pressed such gas into tank to generate electricity or sold to market.
- The principle we use is highlow temperature pyrolysis, the normal temperature is 0~400ºC, and the pressure in the whole process is slight negative pressure. We also use gas purifying system in our new design, after purifying, the emissions is cleaner, which is more environment friendly. In a word, it is safe, energy-saving, environment friendly and easy to operate.
7: Installation, Guarantee and Sales-after service of the Continuous Waste Rubber Recycling Machine
(1): Installation and Commissioning: The seller shall send at least one engineer to the buyer's assigned place at agreed time by both parties to conduct installation, commissioning and training of sold machines. The cost which may be including salary of 100USD per day, Accommodation, Round tickets, Meals, Transportation, Essential tools etc. during engineer service process shall be borne by the buyer. Seller should burden the visa application, but buyer should help on the documents, etc.
(2): Guarantee of quality: The Seller shall guarantee that the goods are made of the best materials and of first class workmanship, brand new, and comply in all respects with the quality and specifications and performance as stipulated in this Contract. The Seller shall guarantee that the goods, when correctly installed, properly operated and maintained, shall give satisfactory performance for a period of 12months after the day of completion of installations. Human faults or wearing parts not included in the quality guarantee.
(3): Coverage:The warranty foresees the supply, free of charge, of the parts of the machine that get broken due to manufacturing defects.
The warranty does not cover damages and/or loss of production due to machine stops or for the bad running caused by the damage.